How To Install An Indoor Playground Efficiently: Lessons From Project in Tianjin Beichen District 4000 SQM Franchise Case By Pokiddo

Publish Time: 2025-05-09     Origin: Site

Efficient Installation Strategies for Indoor Playgrounds


Installing a large - scale indoor playground franchise demands careful planning, innovation, and professional know - how. Safety lies at the heart of Pokiddo's operations. As a seasoned amusement facilities manufacturer, we recognize that a successful indoor playground relies on both creative initial planning and the precise implementation by an experienced construction team. With years of industry immersion, we've successfully completed numerous projects, ranging from 90 - 4000 square meters. Our installation engineers, armed with advanced techniques, efficiently use custom tools and high - quality materials. Our modular installation system and refined processes ensure a 1:1 replication of the design blueprint, with every theme element and safety detail stringently examined. In our workflow, common installation issues such as material shortages, schedule delays, and structural risks are systematically avoided. Take our Project in Tianjin Beichen District 4000 SQM Franchise Case as an example. This landmark venue, integrating sports and play, will comprehensively display our modular construction system and management strategies. We'll show you how we transform designs into immersive spaces while maintaining the highest safety and quality standards. Choosing Pokiddo means opting for efficient delivery and unwavering quality assurance.

Step-by-Step Guide & Solutions to Common Questions

  1. How to evaluate whether a site is suitable for the installation of amusement equipment? Is it necessary to consider geological conditions or restrictions of the surrounding environment?

The Project in Tianjin Beichen District 4000 SQM Franchise Case Model: A Blueprint for Precision Engineering Through layered safeguards such as laser-guided zoning and modular prefabrication, this project transforms complex sites into highly resilient play ecosystems. By prioritizing geotechnical integrity, adaptive layout design, and context-sensitive solutions, operators achieve more than compliance—they create spaces that deliver lasting value through safety, efficiency, and visitor-centric innovation. From 4,000㎡ complexes to smaller venues, this multidimensional approach ensures every site balances playful exploration with engineered excellence. Evaluating a site’s suitability for play equipment requires comprehensive analysis across three critical dimensions, as demonstrated by Tianjin Beichen’s 4,000㎡ sports-play complex. This benchmark project illustrates how strategic integration of layout design, geotechnical engineering, and environmental adaptability ensures safety, efficiency, and operational excellence.

1. Layout Optimization:The Core of Functional Design Scientific zoning is the core of operational efficiency, customized to the site's spatial attributes and user needs: 

Zoning by Age Group and Activity Type:

-Teen Extreme Challenge Zones: High-intensity activity areas (e.g., rock climbing, rope courses) utilizing the venue’s 8-9m ceiling height.

-Parent-Child Non-Powered Exploration Zones: Interactive areas (million-ball pits, EPP block kingdoms) adjacent to rest zones for convenient parental supervision.

- Family Leisure Hubs: Café and seating areas integrated into column-dense zones, transforming structural obstacles into 360° panoramic viewing platforms.

2. Flow Management: Clear primary and secondary circulation routes reduce congestion, supported by real-time monitoring systems covering 40+ activity nodes to ensure blind spot-free safety supervision during peak hours (daily visitor flow exceeding 1,500 pax).

3. Geotechnical Assurance: The Engineering Foundation for Structural Stability Rigorous evaluation of ground conditions to support heavy equipment and mitigate settlement risks:

- Ensuring ground bearing capacity in areas for trampolines, climbing structures, etc.

- Modular Solutions for Complex Geology: Off-site fabrication of ASTM  certified steel frameworks and EN compliant safety netting, reducing on-site construction by 30% and minimizing reliance on unstable ground.

- Pre-assembled structural components (e.g., column-mounted rope course platforms) designed to integrate with existing factory pillars, optimizing load distribution and cost control.

4. Environmental Adaptation: Harmonious Coexistence with Urban Contexts Proximity to residential areas and traffic arteries requires balancing entertainment experience with safety and sustainability:

- Noise Control: - Soundproof panels and rubber shock-absorbing flooring in slide and trampoline areas, controlling noise at ≤55dB, compliant with GB urban noise standards.

- Logistics Optimization: - Dedicated nighttime transport routes for 40+ truckloads of equipment, avoiding peak-hour traffic on Beichen Avenue. - Real-time GPS tracking of material deliveries during the 45-day construction period to separate construction and visitor pathways.

- Regulatory Compliance: - Meeting dual international (EN 1176, ASTM) and national (GB) safety standards, verified by third-party TUV inspections for structural load (1.5x operational stress) and fall protection (1.5m safety buffer zones).

2. How to Coordinate Equipment Installation and Venue Renovation? 

To ensure efficient progress of indoor play equipment installation, we recommend synchronizing venue renovation with the equipment production cycle. The core principle is to complete all renovations in the equipment installation areas before equipment arrival, while conducting parallel construction in non-conflicting zones (e.g., rest areas, cafes). Specific implementation steps include:

Spatial Planning Prioritization: - Locate second-floor rest areas outside equipment installation zones to avoid spatial conflicts. 

                                                                - Finalize wall painting and lighting system installations in advance to prevent schedule delays caused by cross-construction.Safety Baseline Prepositioning: Critical safety-related renovations (flooring, electrical systems) must adhere strictly to equipment technical specifications: 

- Load-Bearing Reinforcement: Equipment zone floors must meet load standards (referencing the ASTM-certified modular foundations used in the Beichen project).

- Electrical Isolation Design: Power supply systems for play equipment should operate independently of the venue’s lighting network, matching TUV-certified electrical box protection ratings.

- Dynamic Progress Control. By pre-rehearsing construction workflows, define three dynamic construction zones: "equipment pre-installation zones," "renovation work zones," and "buffer zones" to ensure: 

- Off-peak operations for transporting large components and decorative works (referencing the dedicated freight passages strategy from the Beichen project). 

- Daily comparison between the construction site and 3D blueprints to control progress deviation. This phased, zoned collaborative approach not only shortens the overall project cycle and reduces comprehensive costs but also ensures millimeter-level integration between customized play equipment and the venue environment. (For detailed strategy specifics, refer to theTianjin Beichen Project Case.

3. How to resolve weather-related delays or site access issues caused by rain?

To effectively address the challenges of construction during the rainy season, we have developed a comprehensive set of safeguard measures. In terms of material management, we proactively plan covered storage systems. By erecting temporary rain shelters or leasing containers, we provide moisture protection for essential materials such as steel and wood. For components prone to moisture damage, like EVA floor mats , we employ vacuum packaging and store them in temperature - controlled environments to prevent performance degradation caused by humidity. Additionally, we categorize and manage all inventory using a labeling system, ensuring rapid identification and retrieval of materials during emergency situations in the rainy season. Regarding construction strategies, to overcome site access limitations, we adopt a modular pre - assembly approach. We complete over 70% of structural testing, including crucial components like climbing frames and slide connectors, in the factory. This significantly reduces complex on - site installation procedures and the frequency of heavy equipment usage. Furthermore, we have mapped out alternative transportation routes, such as creating temporary access lanes or scheduling nighttime deliveries, effectively avoiding peak - hour traffic congestion and ensuring the smooth progress of the project.

4. When assembling the structural frame of an indoor playground, what key steps should be paid attention to? 

    What tools are required? How can we ensure that the frame is stable and meets the safety standards?

During the Vertical Post Installation phase, begin by identifying and securing key posts (e.g., A1, B1, C1) based on markings, which serve as the guiding benchmarks for the entire framework. For example, prioritize fixing posts A1-B1-C1 to establish the base structure, ensuring that the catchers (pre-attached to the posts) remain aligned, with the screw holes on the first-floor posts facing upward. Proceed to Crossbar Installation: install 117cm-long standard crossbars between marked posts (e.g., A1-A2), while unmarked crossbars are interchangeable. To stabilize the framework, prioritize installing top-level crossbars (e.g., A1-A2) before adding subsequent structural layers.

The component installation:

Plastic Components & Soft Play Installation: Follow the modular design guidelines provided by the indoor playground manufacturer to securely install PVC panels, slides, ball pits, and climbing nets. Critical steps include using anti-loosening bolts for slide joints and ensuring uniform tension in climbing nets . After installation, EN 1176-certified safety netting must be tightly secured around the structure.

Safety Flooring Installation: After completing the main structure, lay shock-absorbing EVA foam mats across the entire area. Select mat thickness based on equipment height (e.g., 30mm mats for structures under 1.5m) and achieve seamless edges via tongue-and-groove joints or heat-sealed adhesives. Smooth rounded edges and secure them with aluminum trim to prevent tripping. Conduct a post-installation 3kg steel ball impact test to validate shock absorption.


Ready to Build Your Dream Playground?Visit to explore our portfolio or request a quote. Let’s create safe, innovative spaces that inspire play and growth! If you are interested in our company's products or projects, please feel free to contact me directly.



What is the working principle of the jungle adventure high-altitude rope / rope? B

What is the working principle of the jungle adventure high-altitude rope / rope? A

Some questions about Giant pin art

How to choose the right logistics method

FAQ about EVA floor mats