Daycare & Kindergartens
-
How To Create A Kindergarten From Scratch?The article details the four-stage process of building a kindergarten: preparation (providing designers with CAD drawings, elevation maps, and site photos), design initiation (confirming key flows like fire access ≥1.2m wide/2m high), plan refinement (product design first, then environment design for existing clients), and implementation (three-tier installation support). It also warns against three misunderstandings to meet safety standards and educational goals.Daycare & Kindergartens October 10, 2025
-
Real design of a kindergarten project in Africa covering over 6000sqmThis article introduces the African Kindergarten Project in Kenya, designed by Bettaplay. It covers an outdoor area of 6,000 square meters and an indoor area of over 3,000 square meters, aiming to become the largest noble-class kindergarten in the local area and even Africa.
Adhering to the "elite education" concept, it offers diverse courses, adopts a small-class system, and equips classrooms with electronic screens. It also details outdoor functional zones and indoor characteristic spaces, demonstrating its high-end positioning and educational value.Daycare & Kindergartens September 16, 2025 -
Bettaplay kindergarten case, Beautiful Beginnings, Bahrain1.Overview of kindergarten rectification casesKindergarten Name:Beautiful BeginningsPlace:5FXG+CV3 Al Markh, BahrainDesign Manufacturer:BettaplayService content: design, production, installation2.Project BackgroundFaisel Janahi, the founder of Beautiful Beginnings, is a pilot himself. When he was yoDaycare & Kindergartens March 11, 2025