Bettaplay & Pokiddo Atlanta USA 6000 Sqm Indoor Playground With Giant Slide & Adventure Obstacle Course & Climbing Wall & Trampoline Amusement Park Turnkey Project

Project Overview

   

     

Atlanta, Duluth: 60,000 sq ft, Zero Experience, 1,900+ Members    

Address: 2205 Pleasant Hill Rd, Duluth, GA 30096, USA    

   

A Chinese family with a restaurant business took a large space in Duluth even though they had no park experience at all. The park has five zones and ten party rooms, and its location already provides steady foot traffic: 20+ schools within 8 km, and 14 shopping centers within 3 km.    

They opened on August 15, 2025. Three months later: 1,900+ members, weekend parties booked through April 2026. The second generation runs it, and they understand today's families better than their parents do.    

Our role covered site analysis, zoning, and attractions the neighbors don't have (go-karts, 360 bikes, a climbing matrix); we also completed a 1:1 trial build before shipping to US standards.    

We know production, operations, profitability. DM "Atlanta Case" for the full file.    

   

Structure Size             6000 sqm            
Play Zone Size            

5000 sqm play area                

Location             Atlanta, USA            
Capacity             400 kids and more            
Main Play Elements             naughty castle, climbing wall ,trampoline,ninjia course,zipline,rope course            

Main Materials                

Plastic Parts: LLDPE, ABS            
Soft Parts:inner by laminated wood, middle by EPE, the high-pressure polyethylene foam, outmost layer by phthalate-free & eco-friendly colorful PVC fabric            

Structure Frame: inner by Φ48mm, thickness 1.5mm/ 1.8mm round  hot-galvanized steel pipes, covered by quality PVC foam padding  (also available for special thickness)                

Flooring: quality interlocking EVA foam mats /PVC carton tiles/ interlocking ABS floor mat/artificial grasses            
Safety netting: square/diamond fireproof ropes and nets, muliple color for choice.            

Certificate                

 CE, SGS testing report, EN71, EN1176, ASTM forms, TUV            

Player Age                

 3-14 years
           

Installation Service                

1.install by yourself :we will provide detailed installation instructure , also make the installation group with our experienced engineer to help installation                 

2.provide installation service with paid                 

Warranty                

1 Year for all spare parts            

Spare Parts Replacement                

BETTA provides all spare parts for playgrounds, available for purchased alone, contact our professional sales for whole spare parts list

           


1. Science-Driven, Operations-Oriented Planning

We divided the project space into five functional zones: trampoline zone, adventure zone, climbing zone, soft-play zone, and leisure & F&B zone. This zoning not only enriches the visitor experience but also makes it easier to implement differentiated ticket pricing and targeted management. In particular, the 10 party rooms directly address strong local demand for family birthday parties and group events, making them a "stabilizer" for weekend revenue.

【Venue Positioning】

【Project Zoning Plan】

【CAD】

【Project Circulation Plan】


2. Deeply Integrated 3D Design

From the "climbing matrix" of cube climbing, bouldering, and art climbing, to the "dual differentiated engines" of the go-kart track and the 360-degree bike, and to the "young-family retention combo" of the devil slide, dry-ski jump, and wave slide—our in-house design team delivered an integrated 3D design solution covering everything from equipment layout to interior fit-out, ensuring every square meter serves both operational efficiency and the visitor experience.

【3D Renderings】



【Interior Theming Design】

【Grand Opening of Our Flagship Store in Atlanta, USA】A new landmark for Pokiddo—witness the excitement in just 17 seconds!   

This project serves families, teenagers, and adult sports enthusiasts in Atlanta and the surrounding area. It is more than a collection of play equipment—it is a branded entertainment destination offering diverse experiences:

  • Trampoline Zone: free jump, professional trampoline, angled trampoline, slam dunk, spider climb, and foam pit jumps

  • Adventure Zone: high ropes adventure, ropes course, swinging bridge, go-kart, and 360-degree bike 

  • Climbing Zone: cube climbing, bouldering, art climbing, competition climbing, kids climbing, jump tower, and plum blossom stakes (balance poles)

  • Leisure & F&B Zone: 10 party rooms, dining area, prize machines, and arcade games

【POPO Takes You Inside the Party Rooms】Today's tour of the Pokiddo themed party rooms starts with a group photo with the kids!

For parents: a clear circulation plan and Pokiddo's consistently high safety standards let parents feel confident letting their kids play, while they themselves enjoy comfortable dining and rest areas.

For operators: operations-oriented planning, together with the post-opening operational support Pokiddo provides, gives the park solid backing to keep attracting foot traffic and growing revenue.

Want to know about more playgrounds near you? Reach out to me for details.



Project Story

From the Kitchen to the Playground: 6,000 Square Meters in Atlanta

In the heart of Duluth, Atlanta, a Chinese restaurateur who had spent years building a career in food service made a bold decision: to cross industries and open a commercial indoor playground.

A great site. Serious investment. Zero experience. Indoor play was a completely unfamiliar battlefield for him — well located, but surrounded by strong competitors. Could they win?

A second-generation restaurant family moving into indoor play — what made this kind of success possible?

The story begins eight years ago.

01 | Eight Years Ago, Our First Meeting

In 2017, this investor was still focused entirely on the restaurant business in the United States.

That year, he and his partner traveled back to China to look at indoor playground projects in Qiaoxia, Wenzhou. It was on that trip that he met POKIDDO's Mr. Bao.

He understood this business. A playground and a restaurant do the same thing: traffic, repeat visits, experience. The difference is the ceiling — a playground's ceiling is higher, and there is far more room to extend beyond it.

After he returned to the US, the pandemic put the project on hold. Conversations stopped. The plan went back into the drawer.

But one thing never stopped: staying in touch.

Over the following years, he kept watching POKIDDO grow, and kept watching the US market. The seed of trust was planted in those years of on-and-off conversation, and it grew a little at a time.


02 | Why a Playground

In 2023, the timing was right. The two sides reconnected, and the project officially began.

Why a playground, and why now? The client gave a remarkably candid answer:

"The next generation isn't very interested in the restaurant industry. A playground is a business better suited to young people to run."

Behind that sentence is a reality many overseas Chinese families are facing: the restaurant business a father built is not necessarily a business his children want to inherit — and whatever they do want to inherit has to be something they genuinely like, and something they can carry.

A playground fit perfectly.

It's young, it's energetic, it connects directly to children's world, and it naturally suits a second generation that wants to do things in new ways — social media, community events, party packages, membership programs.

The direction was set. But direction has never been the same thing as a path.



03 | How a Cross-Industry Investor Actually Does This

The most honest anxiety a cross-industry investor has is rarely "should I invest?" It is "which step do I take first?"

Is there a measurable standard for site selection? What exactly makes a good location "good"?

With no experience in equipment selection, how do you judge which solution fits your space and your customers?

Construction, installation, handover, fire and insurance compliance — which step is going to stall?

And once you open: where do visitors come from, how do you fill weekdays, how do you turn parties into a product?

These questions share one thing in common: none of them can be solved with money. They are solved with experience.

So they made one key decision — choosing POKIDDO as their play equipment partner.

More precisely, as the solution provider for the entire park.

From site analysis and space planning to equipment manufacturing and on-site installation, POKIDDO delivered a complete end-to-end program — from zero to one.

The two young operators didn't have to work out the first step on their own. They could put their energy where they were strongest: running people, running service, running community.

Selling equipment is selling an object.

Delivering a full solution is delivering a system that actually runs.



04 | From Drawings to Opening Day

In August 2025, POKIDDO completed delivery in Atlanta, Georgia: a 6,000 sqm playground, including 4,900 sqm of play equipment.

It was an important step for us in the North American market — and a real test of what "one-stop solution" actually means.

Every item on the delivery list represents concrete work:

Site analysis — turning "this feels right" into an assessable customer model and traffic projection;

Space planning — how people move through the space, how zones are arranged, where parents sit so they can see their children;

Equipment manufacturing — produced in our own factory, with material, structure and dimensions controlled before anything ships;

On-site installation — cross-border construction coordination, schedule alignment, same-day response to issues on site;

Compliance and handover — clearing each requirement under local standards and insurance rules, one gate at a time.

On August 15, 2025, the park opened its doors.



05 | The Second Store: New York

The success in Atlanta showed the investor what brand partnership is really worth.

Today, his second store — in New York — is about to open.

From Atlanta to New York, from one park to two: this is a deepening of a partnership, and a continuation of trust.

For a cross-industry investor, the reasons to open a second store are usually simple:

The first playground's numbers add up.

The first playground's team can run on its own.

The first playground's partner can be relied on.



A site visit in Qiaoxia, Wenzhou, 8 years ago became a lit-up playground in Atlanta — and a booking calendar filled solid.

In between were a pandemic, a pause, a restart — and two young people going from "zero experience" to "they can run it themselves."

There was no miracle here. 

Only three very simple things:

  • First, crossing industries isn't the problem. Missing the system is.

A restaurant operator already has commercial instinct, service awareness and local connections. What's missing is the playground's own body of expertise: site models, circulation design, equipment standards, compliance pathways, operating rhythm. And that body of expertise can be delivered.


  • Second, delivery isn't the finish line. It's the starting line.

Equipment arriving and a ribbon being cut are only the beginning. The real value lies in the reviews, training, maintenance and hands-on operational support after opening — which is why we flew over again three months later.


  • Third, trust takes time to grow.

From 2017 to 2025 — eight years, two pauses, one restart — and only then a second store.

POKIDDO has more than 60 branded stores worldwide, and 70% of them reach payback within 6 to 18 months. These are not marketing lines. They were earned one store at a time, across more than 60 locations.

We often say one thing:

You don't have to step into the potholes we've already stepped in.


If you're considering an indoor playground in your own city — whether you come from restaurants, hotels or retail, or you're already in the industry and want to upgrade your brand — message me for the 【Atlanta Case Full Breakdown】.

It covers the site-selection logic, the space-planning approach and the operating data from the first three months.

POKIDDO Makes Sports Fun.







Production to Installation

POKIDDO, Atlanta, USA-Production time: 60 working days


POKIDDO, Atlanta, USA–Shipment volume: 10 40HQ containers

POKIDDO, Atlanta, USA –Installation team size: 4–6 POKIDDO installation engineers + 20 local assistants

POKIDDO, Atlanta, USA – Installation period: October 2024 – June 2025


The difference between 1,000㎡ and 3,000㎡ goes well beyond just the quantity of equipment: Production hours

  • Container load requirements

  • Ocean freight costs

  • Installation labor

  • Project timelines

all of these must be recalculated. 

Send me your facility’s square footage and city, and I will provide you with a "Facility Construction Cost & Planning Estimate."


Opening & Results


   

Installing the equipment doesn't mean we can open the doors.

Once installation is finished, our engineers stay on site and sign off every attraction one by one: is the structure solid, is every connection locked

down, is every guard and pad properly fitted, does everything run smoothly. Nothing gets handed over until each item has been run through.

At the same time, there's a class for the store team: how to guide children to play safely, how to put gear on and buckle a harness; and when something goes wrong with the equipment, what they can fix on the spot, and what has to wait for an engineer.

In the end, we only want two things.

When the park opens, every child can play without holding back, and no parent has to stand at the edge worrying.

When the park closes, every hidden problem is found and fixed the same day.

   


   

Choose us ! Your Kids' Zone Builder & Consultant !




 

How to start Your Project

The most expensive sentence in this business is: "We'll sort out the permits later."


It costs nothing to say. What follows it is months of rent still running, an opening date that no longer exists, and a team standing around.


Equipment can change. Design can change. Fit-out can change. A signed lease and an opening date promised to a landlord cannot — and both happen before the first slide is ordered.


We have delivered parks in more than 60 brand locations across different countries. The technical work — design, manufacture, installation — is broadly transferable. What is not transferable is the compliance and cost structure around it.:

A first-time US investor usually discovers six things the hard way:


· Permits are issued at city and county level, not nationally.

What it costs you if ignored: 2–6 months of additional schedule; rent clock already running.


· A play park is often classified as an assembly occupancy.

What it costs you if ignored: Egress, sprinkler, and occupant-load redesign after drawings are done.


· Safety standards are consensus standards, not one federal law.

What it costs you if ignored: Insurer or local inspector rejects materials that "passed" elsewhere.


· Commercial leases are long, personal-guarantee-heavy documents.

What it costs you if ignored: 5–10 years of fixed obligation on numbers you guessed.


· Duty and tariff exposure sits on imported equipment.

What it costs you if ignored: Landed cost well above the FOB quote you budgeted.


· Labor law, teen work hours, and workers' comp are state-specific.

What it costs you if ignored: Staffing model breaks in the first peak weekend.


None of this is a reason not to build in the US. It is a reason to sequence the work correctly.


So this piece skips the story and follows the order you will actually meet: market first, then the seven numbers, then compliance, supplier, lease, delivery, people, and the first 90 days.


Every section carries real numbers from US family entertainments centers(FEC) we have delivered — so you can decide which line to copy and which one to avoid.


Step 1 — Validate the local market before you design anything

Most underperforming parks were designed before the market was researched. Before you talk to any equipment manufacturer, answer six questions about your specific trade area.


1. How many comparable venues are within a 45–60 minute drive?

Visit them as a paying customer, not as an investor. Buy a ticket. Count the party rooms. Look at the padding at the bottom of the slide and the state of the ball pit. You are not there to be impressed — you are there to find the gap.


2. What do local birth rates and school density look like?

Our Atlanta site is a good illustration: more than 20 schools within a 5-mile radius, and 14 shopping centers within 2 miles. That is not luck — that is a trade area that produces families on weekday afternoons and school groups on Friday mornings.


3. Where do local families already spend weekends?

Malls, supermarkets, community parks, sports complexes. Locating next to an established family destination means you inherit traffic instead of buying all of it.


4. Which weather problem do you solve?

Indoor play is a weather business. In the US this changes by region: brutal summer heat in the South, long winters in the Midwest and Northeast, rainy seasons on the coasts. Know how many weeks per year your market needs climate-controlled play. In Atlanta it is summer heat. In Staten Island it is winter.


5. What is the local birthday party culture?

This is the single most under-modelled line in a US business plan. Party revenue per square foot usually beats walk-in admission margin, and it is booked weeks in advance — which means it stabilises your weekend and your cash flow. If local parents routinely book outside venues for birthdays, party rooms must be designed on day one, not retrofitted in year two.


6. What is your competitor's biggest weakness?

Dated equipment, poor hygiene, no food, no party hosting, exhausted staff. That weakness is your differentiation, and it should drive the layout brief — not the other way round.


Write the answers down. They become the assumptions in Step 2.

Step 2 — The seven numbers that decide the project

1. Total investment budget.

Design, custom equipment manufacturing, ocean freight and duty, interior fit-out, lease deposit, permits and professional fees, opening marketing, and — the one everybody forgets — working capital to survive the ramp-up weeks before the party calendar fills.


2. Revenue per square foot (per m²).

Annual admission + party + food and beverage revenue divided by rentable area. This number sets the maximum rent you can afford. Not the other way round.


3. Admission price and visit frequency.

Ticket price, average dwell time, and return frequency. In the US, high repeat visitation beats a high one-time ticket. A lower ticket bought three times a year is a better business than a higher ticket bought once.


4. Birthday party conversion rate.

Weekly party volume, average package price, and food margin. Model it per party room, not per park.


5. Staffing ratio and payroll.

Peak-shift headcount and floor supervision model. In the US, labor is your largest controllable cost — and your least flexible one.


6. Rent-to-revenue ratio.

Base rent plus CAM (common area maintenance) plus taxes, divided by projected gross revenue. This ratio tells you whether a lease is a partnership or a burden.


7. Payback period.

Months of operation required to recover initial capex. Across the parks our group has built and operated, payback has typically landed somewhere between 6 and 18 months — the spread comes from rent, pricing and how fast the party calendar fills. Any supplier who guarantees you a payback number is not giving you a model, they are giving you a sales pitch. Treat guaranteed returns as a red flag.

Step 3 — The US compliance stack: entity, permits, insurance

This is the step that most overseas investors underestimate, and it is where a layout decision taken too early turns into a nine-month delay.


1:Entity and tax. Form your LLC or corporation at state level, obtain your EIN, register for state sales tax, and check whether your state or city levies an admission or amusement tax. Do this before you sign a lease — landlords and vendors will ask for it.


2:Zoning and occupancy classification. A play park with trampolines, climbing and party rooms is usually treated as an assembly occupancy. That triggers egress width, exit count, sprinkler coverage, flame-spread requirements for soft materials, and occupant-load calculations — all of which affect your layout. Confirm the classification with the local building department before the design is frozen, not after.


3:Building permits and certificate of occupancy. Mechanical, electrical, plumbing, fire alarm, and fire sprinkler permits are separate approvals with separate inspectors. In a mall, your landlord's design review runs in parallel and can add weeks of its own.


4:Amusement device regulation. This is state-level, and it varies widely. New York is a clear example: operators must apply to the New York State Department of Labor for an amusement device permit annually, at least 10 days before first use, with an inspection before the device is first used ([NY DOL amusement device permitting](https://dol.ny.gov/amusement-device-permitting-new-york-state)). If you are opening in a state like this, the permit is not a formality — it is a gate on your opening date.

5:Safety standards. The US does not run on a single federal playground law. It runs on consensus standards that become de facto mandatory the moment your insurer, your local inspector, or your landlord's risk team asks for documentation:

· ASTM F1918 — soft contained play equipment

· ASTM F1487 — playground equipment for public use

· ASTM F2970 — trampoline courts (design, manufacture, installation, operation, maintenance, inspection)

· ADA Title III — accessible route, transfer access, restrooms, and staff training for a place of public accommodation


Ask any supplier for the actual test reports behind these claims, not a logo on a catalogue page. Material test reports from TÜV or SGS should be traceable to the batch that is shipping to you.


6:Insurance. General liability, commercial property, business interruption, and workers' comp (mandatory in nearly every state). Your carrier will ask about supervision ratios, waiver process, inspection logs and equipment certification before they quote. Get the broker involved during design, because their answers will change your staffing model.


7:Liability waivers. Digital waiver systems are standard now, but enforceability — especially for minors — differs by state. Have US counsel review your waiver language before you print it on a tablet.


Step 4 — How to screen an indoor playground supplier

First-time investors rarely get hurt by the base price. They get hurt by what is missing from it.


The 8 screens:


1. Custom spatial design capability. Can they produce integrated CAD layouts, 3D proposals and engineering drawings built around your columns, fire routes and clear ceiling height? Catalogue resellers cannot adapt to a real building.


2. In-house manufacturing. Is the equipment fabricated in their own plant or subcontracted? Subcontracting is usually where spare-part support disappears two years after opening.


3. Verified compliance documentation. Not "we meet ASTM" — actual test reports and certificates, matched to your configuration.


4. Visible quality-control milestones. Material sampling, dedicated QC inspectors, structural trial assembly of steel frames before dispatch, component stress testing.


5. Professional installation support. Do they send qualified engineers, and do they provide millimetre-grade drawings that a local crew can build from? Installation errors are the number one cause of delayed openings.


6. Long-term maintenance and spare parts. Emergency repair kits in the shipment. Replacement parts available in year five. A named person who answers the phone in year three.


7. Direct operating experience. Does the company run parks itself, or only sell equipment? A supplier who has never made payroll tends to design spaces that look beautiful in a rendering and are inefficient to supervise.


8. Verifiable references in comparable markets. Any vendor can produce a 3D render. Ask for an address you can visit.


Six red flags that should end the conversation:

· They promise a layout before asking for structural drawings, ceiling height and fire exits.

· The factory tour is a pre-recorded video instead of a live walkthrough.

· The business licence is registered as trading or distribution, not manufacturing.

· The quote omits freight, duty, installation, taxes or clearance documents — all of which appear later.

· Answers about steel wall thickness, welding standards or foam density are vague.

· The price is unusually low. Something was reduced: padding density, net strength, or steel gauge.

Step 5 — Design for operations, not for renderings

A layout is an operating system. Two principles matter more than aesthetics.


1:Zone by price and by supervision. Our Atlanta park is split into five zones — trampoline, adventure, climbing, soft play, and hospitality — and our New York park into eight: active trampoline, challenge and exploration, slide carnival, climbing, non-powered play, digital sports, hospitality, and service. This is not decoration. Different zones justify different tickets, different staffing levels and different dwell times, and they let you close one area for maintenance without closing the business.


2:Size the party rooms from the local party culture, not from leftover space. Atlanta runs 10 party rooms and they became the weekend revenue engine. New York runs 8, ranging from 30 to 42 m² (≈320–450 sq ft) — deliberately different sizes so a 10-child party and a 25-child party are both profitable.


3:Then let the 3D design serve the plan. In both US projects the same internal team handled equipment layout and interior environment design together. That matters more than it sounds: when the theming and the equipment are designed by two different companies, you get sightline blind spots, dead corners, and furniture that blocks the supervisor's view of the ball pit.


Step 6 — Negotiate the lease like an operator


A US commercial lease is a long-term legal obligation, often with a personal guarantee. Negotiate with a model, not with hope.


1. Rent-free fit-out period. Long enough to cover equipment production, ocean shipping, customs clearance, permitting, on-site assembly and staff trials. In a mall, ask for the period to start at handover, not at signature.


2. Rent structure. Push for a turnover-linked or hybrid model (lower base plus percentage of revenue) in the first operating year. That shares the ramp-up risk with the landlord.


3. Step-ups tied to anniversaries. Rent escalation should follow your trading anniversary, not a rigid calendar date that may land before you open.

4. Break clauses. A defined checkpoint at month 24 or 36, with pre-agreed terms, protects you against demographic shifts you cannot control.


5. Capped CAM and utilities. Cap common area maintenance, utility surcharges and shared HVAC. Uncapped CAM is a silent rent increase.


6. Exclusivity / radius protection. A clause preventing the landlord from leasing adjacent space to a directly competing indoor play concept. In a mall this is negotiable more often than people assume.


7. Realistic opening deadlines. Align contracted opening milestones with actual overseas production and logistics timelines — otherwise you pay penalties for a schedule the landlord wrote.


One more US-specific item: confirm who pays for what in the landlord's work letter. Demising walls, sprinkler modifications, HVAC capacity for a high-occupancy play floor and restroom upgrades are frequently the tenant's cost, and they are not in your equipment quote.


Step 7 — Manufacturing, shipping, and why "installed" is not "open"

For a 700–1,500 m² venue, design, fabrication, shipping and installation typically take 3–6 months depending on structural review and local permitting. For a 5,000-square-meter U.S. mall project, the timeline spans roughly one year: our Atlanta project is set to be signed in 2024, with an opening scheduled for June 2025.


Two things compress that timeline, and both happen before the container leaves.


Factory trial assembly. Before dispatch, we build the core functional areas at 1:1 in our 36,000 m² facility in Wenzhou — the high-rope course frame, the slide load-bearing structures, the soft-play modules. Every connection point is rehearsed and calibrated, then the components are numbered, disassembled and packed. The client sees the real thing before it crosses the ocean, and the local install crew gets a numbered puzzle instead of a pile of steel.

A packing list that matches the drawing. Sounds trivial. It is the difference between a four-week installation and a ten-week one.


Then the part nobody puts in the brochure: installation completion is not opening. After the last bolt is torqued, you still need the fire inspection, the electrical sign-off, the amusement device inspection where applicable, the certificate of occupancy, the insurance certificate, and a staff team that has actually rehearsed an evacuation. We have seen venues sit finished and empty for months because one of those was missing.


Step 8 — Hire and train before opening day

The most common US staffing mistake is hiring one general manager and expecting them to handle safety supervision, front desk, community marketing and party sales at the same time. That person does not exist at the salary you are planning to pay.


Hiring order:


1. General Manager — early, so they complete full operational training well before opening.


2. Party & Events Coordinator — birthday packages are an active sales function, not a scheduling task.


3. Floor Play Supervisors / Safety Coaches — the frontline staff who enforce rules, cover blind spots, and are the reason a parent relaxes.


4. Reception and Cashier — with a ticketing and digital waiver system that does not create a check-in queue at 11am on Saturday.


Pre-opening training must cover: guest safety protocol, emergency incident response, equipment inspection routines, party execution, and the POS/waiver system. Then run a soft opening with real families and real queue pressure before you advertise.


Step 9 — The first 90 days

This is where the two US projects differ most from a generic playbook.


Atlanta opened on 15 August 2025. Ninety days later:

· 1,900+ members

· Weekend party bookings already sold through April 2026


Four things produced that:

· Trade area — 20+ schools within 5 miles, 14 shopping centres within 2 miles

· Differentiated hardware — go-kart track, 360° bike, and a climbing matrix of cube, bouldering and art climbing that nearby competitors did not have

· Party capacity — 10 rooms, sized and priced to the local birthday culture

· A young operating team — the second generation ran the floor, and they understood what families actually want on a Saturday


That last point deserves a sentence of its own. The investor's reason for entering this business was refreshingly honest: the next generation was not interested in running restaurants, and a play park is a business young people want to operate. That is not a small factor. It is the difference between a landlord tenant and an operator.


Frequently Asked Questions (FAQ)



Q: Do I need amusement industry experience to open a play park in the US?

A:No. Most of the operators we work with are first-time investors — restaurateurs, retailers, hoteliers, real-estate owners. What they share is discipline about local research and a willingness to follow a process. The gap that matters is operational, and it is closed by training and by a partner who runs parks, not only sells equipment.


Q: How much capital does a US indoor play park need?

A:It depends on square footage, ceiling height, attraction mix, mall versus street location, and local fit-out costs. Anyone who quotes you a number before seeing your floor plan is guessing. Send us the plan and we will return an itemised budget that separates equipment, freight, duty, installation and fit-out — so you can see which line is actually driving the total.


Q: How long from first call to opening?

A:For a 700–1,500 m² venue, typically 3–6 months. For a mall-anchored FSEC of 3,000 m² and above, plan on 10–14 months, with permitting and landlord review as the critical path — not manufacturing.


Q: Can I import equipment from China and still meet US requirements?

A:Yes, if the documentation is real and the design was drawn for a US building from the start. The failures we see are rarely about manufacturing quality. They are about a layout designed for a different code environment, and paperwork that cannot be traced to the batch that shipped.


Q: What is the biggest mistake first-time US investors make?

A:Signing the lease before the occupancy classification, egress strategy and permit timeline are confirmed. Rent starts on signature day. Permits do not.

Next step


If you are evaluating a US site, send our engineering and operations team four things:


1. Architectural floor plan (CAD or PDF, with column grid, entrances and emergency exits)


2. Clear ceiling height to the lowest beam or ductwork


3. Target player age range and planned investment budget


4. Project city and state


You will receive a custom 2D CAD layout proposal and an itemised preliminary quotation for your space — and, if it helps, the US Launch Checklist we use internally: the permit sequence, the occupancy questions to ask your building department, and the lease clauses worth fighting for.


POKIDDO Makes Sports Fun. And in the US, the parks that last are the ones that were planned properly before anyone bought a ticket.




Pokiddo 1700sqm Real Case Pokiddocanarias Indoor Trampoline Park Indoor Family Entertainment Park

Concepción Chile Family Sports Center:2,200 ㎡, 5 Zones, 7–8 M Ceiling Turnkey Trampoline Slide Climbing High Ropes

PartyMars Beijing:8,000 M² 114 Attractions 8 Zones Inside Multi-Activity Indoor Play Destination

Bettaplay 2380 Sqm Sports & Entertainment Amusement Park Facilities Indoor Amusement Equipment Indoor Playground Commercial One-Stop Kids Indoor Playground Soft Play Center Customized Theme Park

Bettaplay 2000Sqm Custom Theme Indoor Playground Space Adult Toddler Children Home Castle Kids Playground Set Equipment

Bettaplay 2400Sqm Commercial One-Stop Kids Indoor Playground Soft Play Center Customized Theme Park Equipment

Bettaplay 2500Sqm Custom Theme Indoor Playground Space Children Home Castle Kids Playground Set Equipment

Bettaplay 2600Sqm OEM Custom Children's Play Equipment Maze Games Indoor Playground Equipment Large Trampoline Parks Soft Ball Pools

Bettaplay 3000 Sqm Custom Children's Indoor Playground Equipment Soft Play Playground Large & Small Indoor Children's Play Areas Free Design Services

Bettaplay 3275 Sqm Commercial Indoor Playground Trampoline with Slide for Custom Design and Creative Kids

Bettaplay 3600 Sqm Indoor Playground Trampoline with Slide for Custom Design and Creative Kids

Bettaplay 3995 Sqm Large Kids Indoor Playground Maze Ninja Indoor Kids Children Playground Equipment Good Big Slide Swing Manufacturers

Bettaplay 4500 Sqm Custom Commercial Indoor Playground Equipment-Kids Soft Play Maze Adventure Park Large Slide for Shopping Malls Metal

Bettaplay 5000 Sqm Children Play Zone Naughty Castle Indoor Playground Kids Playground Rides Indoor Naughty Castle

Bettaplay 6000 Sqm Eco-friendly Turnkey Solution Luxury Indoor Playground Equipment with Jungle Theme&Trampoline Park

Bettaplay 7000 Sqm Commercial Children Jumping Park Customized Trampoline Park High Elastic Amusement Park Indoor Playground

Bettaplay 8739 sqm Modern Custom Amusement Park Equipment Kids Indoor Playground With Ball Pit

Bettaplay 1900 sqm Turnkey Solution Commercial Kids Indoor Playground Equipment

Bettaplay 1800 sqm Indoor Playground Durable Playground Structure High-Quality Kids Amusement

Bettaplay 1714sqm Children's Playground Manufacturers Customize Soft Playground Equipment