Bettaplay & Pokiddo Chile Concepcion 2,200 Sqm Family Entertainment Center With Trampoline & Foam Pit & Devil Slide & Climbing Wall & Adventure Tower & Go Kart Track

Project Overview

Concepcion, Chile - 2,200 sqm, 5 zones, open. 

The owner was no beginner: he ran his own park, then watched copycats and price wars eat margins. His answer was not to cut prices but to sign three Pokiddo stores.

The site was a former auto-service workshop: regular structure, 7-8 m clear height. Design rule - operations first, circulation rules. A tree-and-loop route pushes visitors into every corner; the angled areas became climbing and high-rope combos.

Trampoline (free, pro, dunk, foam pit), slide carnival (devil, wave, dry-ski), speed and kids climbing, a two-level adventure tower with zipline, and indoor karting - a differentiator no neighbour can copy.

Core zones were built 1:1 in our 36,000 sqm factory, checked, numbered, shipped. His third store is already in fit-out.

Structure Size 2200 sqm
Play Zone Size

2200 sqm play area

Location Concepcion, Chile
Capacity 400 kids and more
Main Play Elements naughty castle, climbing wall ,trampoline,rope course,kart,ninjia course

Main Materials

Plastic Parts: LLDPE, ABS,
Soft Parts:inner by laminated wood, middle by EPE, the high-pressure polyethylene foam, outmost layer by phthalate-free & eco-friendly colorful PVC fabric

Structure Frame: inner by Φ48mm, thickness 1.5mm/ 1.8mm round  hot-galvanized steel pipes, covered by quality PVC foam padding  (also available for special thickness)

Flooring: quality interlocking EVA foam mats /PVC carton tiles/ interlocking ABS floor mat/artificial grasses
Safety netting: square/diamond fireproof ropes and nets, muliple color for choice.

Certificate

 CE, SGS testing report, EN71, EN1176, ASTM forms, TUV

Player Age

 3-14 years

Installation Service

1.install by yourself :we will provide detailed installation instructure , also make the installation group with our experienced engineer to help installation 

2.provide installation service with paid 

Warranty

 1 Year for all spare parts

Spare Parts Replacement

BETTA provides all spare parts for playgrounds, available for purchased alone, contact our professional sales for whole spare parts list

Step 1: Feasibility analysis of the location

The Chile Concepción project is located in the city's core commercial district. The site was originally the auto-repair workshop of a large, well-known local company—with a regular structural layout and a ceiling height of 7–8 m, giving it excellent physical conditions for building a high-quality park.

Step 2: Confirmation of the layout plan

Design Highlights

  • Tree-branch + loop circulation: guides players naturally into every corner, maximizing attraction coverage while preventing congestion.

  • Efficient use of angled spaces: custom-designed climbing and ropes-course combos for the site's irregular areas, raising space utilization.

  • Parent-friendly configuration: dedicated parents' lounge and party rooms, serving both children's play and family social needs.


Step 3: 3D Renderings and Interior Design Drawings

Guided by the principle of "operations first, circulation is king," the Pokiddo design team planned the 2,200 m² space into five core functional zones:

  • Active Trampoline Zone: free jump, professional trampoline, dunk trampoline, foam pit—classic traffic drivers covering all age groups, and the first choice for burning off energy.

  • Slide Carnival: devil slide, wave slide, dry-ski slide—visual focal points and high-frequency experiences that create a "scream" memory.

  • Climbing Challenge Zone: speed climbing, art climbing, kids climbing—meeting both competition and photo-spot demand while raising the park's professional credibility.

  • High-Ropes Adventure Zone: two-level high-ropes adventure tower with linked zip line—leveraging the ceiling height to create a landmark challenge that extends dwell time.

  • Go-Kart Zone: indoor go-kart track—the differentiated ace in the hole, creating absolute separation from nearby competitors and drawing younger crowds and group bookings.




To learn more about this project, or to find out about other locations near you, click here to contact me.

Click the business card/scan the QR code-Get more information.

Project Story

A Veteran's Third Choice: In Chile, He Took Down His Own Sign

Concepción: a family sports center converted from an auto repair workshop. By the time it opened, his third store was already under fit-out.

Let's start with something you don't see very often.

In this business, most clients come from somewhere else — restaurants, hotels, retail, or simply owning a space with no clear idea what to do with it. Their first question is usually the same: how does this thing make money?

This client in Chile was not one of them.

Back when Chile's indoor play market was still far from saturated, he had already opened his first park. It made him his first real money, and it gave him a judgement: this is a good business — one that keeps generating cash.

So when the time came for a second and a third park, the first thing he did was not look for a supplier. It was to take down a sign he had used for years.

01 · Not a Beginner — Which Is Exactly Why He Knows Where It Hurts

The most overlooked client in this industry is the one who has already made money.

They don't need you to explain revenue per square meter, secondary spend or circulation. Walk a site with them once and they know what fits and what doesn't; show them a rendering and they can see where the dust will collect three years from now.

And for exactly that reason, they are harder to convince.

After his first park succeeded, this client ran straight into the thing every first mover runs into: the market changed.

Chile's indoor play sector filled quickly with copycats and competitors. Equipment became identical, price wars began to show, footfall was split again and again. The good business he knew was turning into a hard one.

One word kept coming back when he talked about it: commoditization.

Three parks on one street, all buying the same equipment, the same slides, the same bounce. Why would a parent choose you? Apart from cutting the price, there seems to be no second answer.

And about cutting price, he knows better than most: once you start, you don't stop.

02 · A One-Line Recommendation: “Why Not Take a Look at Pokiddo?”

The turning point came from a referral inside the industry.

A client we had worked with before — a genuinely loyal partner — had watched Pokiddo take him from a single store to systemized operations, and from local competition to an international brand. He reached out to his Chilean counterpart himself.

“Why not take a look at Pokiddo?”

It is a short sentence, and it was worth more than any brochure. Between operators, “I've used them, it's fine” carries more weight than ten selling points from the seller's side.

What followed was the standard sequence: several site visits, repeated conversations. But the focus was different this time — not “how much is your equipment,” but “how do we win this market again.”

03 · Changing the Sign Was Never About the Money

For an owner who built his own park, gave it his own name and fought his own market, switching to someone else's brand is a step he has to talk himself across.

His words were blunt: “If we're upgrading, we should use a brand that has already been proven internationally. Pokiddo meets that bar.”

Behind that sentence sit three calculations.

First, local trust. In an increasingly crowded Chilean market, an independent brand struggles to separate itself from the newcomers. A brand with global cases (Atlanta in the US, Kenya, China and others), a complete VI system and cartoon IP gives local consumers a preset — professional, reliable, fun — the first time they hear your name.

Second, operations. He has seen too many first-time investors: buy the equipment, open the door, and that's the end. No events, no refresh, no membership management — the buzz is gone in three months.

Third, quality. He has run a park himself. Frame strength, soft-pad detail, safety design, playability — he touches all of it and tests all of it. You cannot bluff him.

On operations he said something we still remember: “That kind of soft support gives me more confidence than the equipment itself.”

04 · The Third Store Is Already Under Fit-Out

The project had only just opened when the client confirmed his third Pokiddo brand-partner store. It is now in fit-out.

From one, to three.

From outside it looks like three deals signed in quick succession. The real logic sits at home: this is a Chinese family building a family business. He has worked the Chilean market for years; his children and his siblings' children are spread across different cities in Chile. Each new store is handed to one of the younger generation to run.

That is why three stores in a row is possible — not because one man can manage three, but because every store has one of his own people inside it.

What supports it is something repeatable: brand, VI, IP, design logic, equipment standards, operating manuals, training systems. A store can be handed to a young person because the model does not need to be reinvented.

A veteran took down his own sign, not because he did not know how to run a park, but because he had done the math.

In a commoditized market, competing on price is a race down; competing on system is the only way up.

Anyone can buy equipment. What cannot be bought is how to choose it, how to arrange it, how to install it, how to run it — and how to make it inheritable by the next generation. That is why a man who has already made money ends up choosing not the cheaper supplier, but a partner who can grow the business with him.

POKIDDO has more than 60 branded stores worldwide, and 70% of them reach payback within 6 to 18 months. These are not slogans; they are lessons paid for one store at a time.

If you are in this industry and running into commoditization and price wars, send me your city, your area and how the business is doing right now — and we will talk honestly about whether changing the sign is worth it.

You do not have to step in the potholes we have already stepped in.


Click the business card/scan the QR code-Get more information.




Production to Installation

POKIDDO, Concepcion, Chile-Production time: 60 working days

POKIDDO, Concepcion, Chile–Shipment volume: 6 40HQ containers

POKIDDO, Concepcion, Chile –Installation team size: 4 POKIDDO installation engineers + 4local assistants

POKIDDO, Concepcion, Chile – Installation period: 30-40days

The difference between 1,000㎡ and 3,000㎡ goes well beyond just the quantity of equipment: Production hours

  • Container load requirements

  • Ocean freight costs

  • Installation labor

  • Project timelines

all of these must be recalculated.

Send me your facility’s square footage and city, and I will provide you with a "Facility Construction Cost & Planning Estimate."


Click the business card/scan the QR code-Get more information.





Opening & Results

Installing the equipment doesn't mean we can open the doors.

Once installation is finished, our engineers stay on site and sign off every attraction one by one: is the structure solid, is every connection locked

down, is every guard and pad properly fitted, does everything run smoothly. Nothing gets handed over until each item has been run through.

At the same time, there's a class for the store team: how to guide children to play safely, how to put gear on and buckle a harness; and when something goes wrong with the equipment, what they can fix on the spot, and what has to wait for an engineer.

In the end, we only want two things.

When the park opens, every child can play without holding back, and no parent has to stand at the edge worrying.

When the park closes, every hidden problem is found and fixed the same day.




Click the business card/scan the QR code-Get more information.






How to start Your Project

Why would an operator who already runs his own park replace his own name with someone else's brand?


In Concepción, Chile, a 2,200 m² family sports and entertainment centre is now open. The site was previously the vehicle workshop of a large local company — regular structure, 7–8 m of clear height.


What is more interesting is the person behind it. He is not a newcomer: he opened his own park back when Chile's indoor play market was still unsaturated, and it made him his first real money.


Then the market changed. Imitators arrived, equipment became interchangeable, price wars started, and traffic split. His answer was not another park under his own name — it was three Pokiddo brand partnership stores, signed in one go.


That decision says one thing: in a mature market, equipment and price are no longer a moat. Brand trust, an operating system, and a model you can hand to the next generation are.


So this piece follows the order: market, the seven numbers, compliance, supplier, design, site, delivery, people, and the first 90 days. Every section is illustrated with the real configuration of this Concepción park.

We have delivered parks in more than 60 brand locations across different countries. Design, manufacture and installation transfer well. Permit routes, building conditions and local competitive structure do not.


In Chile, opening a play park means passing four gates: the municipal business licence (patente municipal), the municipal works permit and final sign-off (DOM, Dirección de Obras Municipales), fire approval (Bomberos), and a food safety permit through SEREMI de Salud if you serve food. If those four are not synchronised, your schedule is not either.


A first-time investor in Chile usually discovers seven things the hard way:


· Converting industrial or warehouse space into a park is a change-of-use file (cambio de uso), not a fit-out file.

What it costs you if ignored: filing it as a fit-out, then being told mid-build to refile — two months backwards.


· Chile runs no single national playground statute; EN 1176 and ASTM become the de facto passport.

What it costs you if ignored: no reports, so landlord, insurer and inspector all withhold signature.


· Fire plans are reviewed by Bomberos, and it is not a formality.

What it costs you if ignored: wrong material class or egress width voids your opening date.


·Chile is seismic: high-rope towers, climbing walls and karting barriers all need engineered anchorage.

What it costs you if ignored: structural sign-off lags, and the equipment sits on the floor.


· Consumer protection law (Ley 19.496) limits how much a waiver can exclude.

What it costs you if ignored: a waiver copied from another country that a court will not uphold.


· Industrial rent is cheap, but the conversion cost is yours.

What it costs you if ignored: floor loading, drainage, fire compartments and ventilation each land outside the budget.


· Chile is phasing in a shorter statutory working week.

What it costs you if ignored: a rota built on the old hours will not match your labour cost two years out.


None of this is a reason not to build in Chile. It is a reason to sequence the work correctly.


Step 1 — Validate the local market before you design anything

Most underperforming parks were designed before the market was researched. Before you talk to any equipment manufacturer, answer six questions about your trade area.


1. How many comparable venues are within a 30–45 minute drive?

What makes the Concepción case unusual: the investor was already one of the competitors. If you are already in the market, your first park is your first rival — the new site has to take traffic from it without killing it.


2. Who is actually paying: parents, teenagers, or young adults?

This 2,200 m² site is aimed at three audiences at once: families with children, teenagers, and young social groups. That is why it cannot be a toddler soft-play box — trampolines, climbing and karting exist for the other two, and they are what make "let's come again" a purchase.


3. Where do local families and young adults spend weekends?

This park sits in Concepción's core commercial area for a simple reason: it intercepts people who were going out anyway and gives them somewhere to stay for three hours, instead of pulling them out of the house with advertising.


4. Which weather problem do you solve?

Concepción's winters are wet and cold. Indoor is not a supplement here, it is the default plan. The harder that need, the shorter your low season — and the less you have to discount to fill it.


5. What is the local birthday party culture?

This park includes a parent lounge and party rooms. Parties are weekend capacity, and that capacity has to be cut into sellable rooms at layout stage — not improvised from a corner after opening.


6. What is your competitor's biggest weakness?

In a market this mature, the weakness is rarely "no equipment". It is homogeneity: the same attractions, the same ticket, the same price war. Your differentiation has to come from somewhere else — brand, content refresh, party products, or one anchor attraction nobody else has.


Write the answers down. They become the assumptions in Step 2.

Step 2 — The seven numbers that decide the project

A Chilean business plan for a play park is not a 40-page document. It is seven numbers you must be able to defend to a landlord, a bank, and yourself.


1. Total investment budget.

Design, custom equipment manufacturing, ocean freight and duty, interior fit-out, lease deposit, permits and technical files, opening marketing, and working capital. For an industrial conversion, add a separate line for conversion cost: floor, drainage, fire compartments, ventilation.


2. Revenue per square metre.

Annual admission + party + food and beverage revenue divided by operating area. A site with 7–8 m of clear height can carry a two-level adventure tower and a zipline — that vertical capacity belongs in the model, or you will underestimate yourself.


3. Admission price and visit frequency.

Families are a repeat business; teenagers buy after-school and weekend hours. One price list for all three audiences usually means you are losing money on one of them.


4. Birthday party conversion rate.

Weekly volume, average package price, food margin. Model it per party room, not per park.


5. Staffing ratio and payroll.

Peak headcount and floor supervision. Chilean employment cost includes social security and statutory hours, and the statutory week is being phased down — budgeting on the old basis is the most common hidden shortfall.


6. Rent-to-revenue ratio.

Base rent plus common charges plus fixed municipal costs such as the patente municipal, divided by projected gross revenue. Industrial rent looks low — amortise the conversion cost into the comparison or you are flattering the project.


7. Payback period.

Months of operation required to recover initial capex. Across the parks our group has built and operated, payback has typically landed between 6 and 18 months — the spread comes from rent, pricing and how fast the party calendar fills. Any supplier who guarantees a payback number is not giving you a model, they are giving you a sales pitch.

Step 3 — The Spanish compliance stack: licence, standards, insurance

This is the step most overseas investors underestimate, and it is where a layout frozen too early becomes a six-month delay.


1:Company and tax ID. Incorporate in Chile, obtain the RUT, register the start of activities (inicio de actividades) with the tax authority (SII), and set up invoicing and filing for IVA (currently 19%). Do this before you sign a lease.


2:Municipal business licence (patente municipal). Issued by the municipalidad*, paid annually, scaled to the activity, area and location. Plenty of projects stall here — not because of the cost, but because the works sign-off behind it is not finished.


3:Works permit and change of use (DOM). Approved by the municipal works directorate (Dirección de Obras Municipales) on drawings and technical files signed by a registered architect or engineer. If the site was industrial or warehousing — as this park's vehicle workshop was — the governing file is a change of use (cambio de uso), not an ordinary fit-out.* This decides whether your plan is legal, so it runs alongside design, not after it.


4:Fire (Bomberos). Egress width, exit count, material reaction class, flame spread on padding and foam, detection and suppression. Play-area padding is a focal point for inspectors, and it is usually where supplier documentation gets vague.

5:Seismic anchorage. Chile is seismic. High-rope towers, climbing walls and karting barriers need anchorage and connection checks against a structural engineer's calculation. That is not "a few more anchor bolts" — it is a signed calculation.

6:Equipment standards. The European benchmark is not a CE sticker. It is:

· EN 1176 — play equipment (design, installation, inspection, maintenance)

· EN 1177 — impact-attenuating surfacing (fall height and critical fall height)

· EN 14960 — inflatable play equipment, if your mix includes it

· REACH — chemical compliance for materials, especially soft goods, coatings and plastics


Ask for the actual test reports behind these standards, and check that the model and configuration on the report is the one shipping to you. We have seen plenty of folders where the standards are all there and the model does not match.


7:Insurance. Civil liability cover (seguro de responsabilidad civil) is not optional in Spain — the municipality, the landlord and any corporate client will ask for the policy. Before they quote, the insurer will look at supervision ratios, inspection logs, your waiver process and equipment certification. Bring the broker in during design, because their answers change your staffing plan.


8:Waivers and consumer law. Chile's consumer protection law (Ley 19.496) limits how much a waiver can exclude, especially for minors. Have local counsel review the wording before it goes on a tablet — do not translate a template from another country.


9:Data and membership. Digital waivers, membership systems and CCTV all involve personal data under the GDPR (RGPD in Spanish). When you choose a POS and membership platform, asking "where is the data stored and who can export it" is far cheaper than fixing it later.


Step 4 — How to screen an indoor playground supplier

The client behind this park had already run a venue, so he read equipment differently from a first-timer: frame strength, padding detail, safety design, play value — he checked each one by hand.


The eight screens:


1. Custom spatial design capability.Can they produce CAD layouts, 3D proposals and construction drawings around your columns, clear height, fire routes and awkward boundaries? A 2,200 m² former workshop always has folded corners and a column grid; a catalogue cannot adapt to it.


2. In-house manufacturing. Is the equipment fabricated in their own plant or subcontracted? Subcontracting is usually where spare-part support disappears two years after opening.


3. Verified compliance documentation. Not "we meet EN 1176" — test reports matched to your configuration, material compliance files, and a traceable batch.


4. Visible quality-control milestones. Material sampling, dedicated QC inspectors, structural trial assembly of steel frames before dispatch, component stress testing.


5. Professional installation support. Do they send a qualified installation crew, and do they provide millimetre-grade drawings a local team can build from? Installation errors are the number one cause of delayed openings — and island projects add a layer: miss a sailing and the next one is weeks away.


6. Long-term maintenance and spare parts.Emergency repair kits in the shipment. Replacement parts available in year five. In South America, the shipping lead time is itself part of your maintenance plan.


7. Direct operating experience. Does the company run parks itself, or only sell equipment? A supplier who has never made payroll tends to design spaces that look beautiful in a rendering and are inefficient to supervise.


8. Verifiable references in comparable markets. Any vendor can produce a 3D render. Ask for an address you can visit, or a live video walkthrough.


Six red flags that should end the conversation:

· They promise a layout before asking for structural drawings, ceiling height and fire exits.

· The factory tour is a pre-recorded video instead of a live walkthrough.

· The quote omits freight, duty, installation, taxes or clearance documents — all of which appear later.

· They offer "CE certification" as the compliance answer but cannot produce an EN 1176 test report.

· Answers about steel wall thickness, welding standards or foam density are vague.

· The price is unusually low. Something was reduced: padding density, net strength, or steel gauge.

Step 5 — Design for operations, not for renderings

A layout is an operating system. This 2,200 m² site was cut into five core zones, and the way it was cut is itself a commercial judgement.


The five zones:

active trampoline (freestyle, pro trampoline, dunk trampoline, foam pit); slide carnival (devil slide, wave slide, dry-ski slide); climbing (speed climbing, art climbing, kids climbing); high-rope adventure (a two-level tower plus zipline); and karting (an indoor circuit).


Clear height is the core asset of this design.

7–8 m is what makes a two-level adventure tower and a zipline possible — and those are the parts a competitor cannot simply copy, because they depend on the building. If the same site had 5 m, the same budget should buy a different attraction mix. The first design question is not "what do we put in", it is "what does this space allow".


Circulation: tree plus loop.

A trunk carries people to the zones; each zone loops internally so nobody retraces a step. The result is maximum coverage — every corner gets traffic, and no single node jams. In an old workshop the column grid tends to turn a "straight" circulation into a corridor; loops are the antidote.


Folded corners are not waste — they are where custom design earns its fee.

Irregular areas became a combined climbing-and-ropes structure, turning leftover geometry into a premium attraction. That is the real difference between custom design and buying catalogue units: catalogue needs a rectangle, custom needs you to read the building first.


Three audiences, three pricing logics.

Families buy memberships and parties; teenagers buy trampoline and climbing time; young adults buy karting and group bookings. Karting here is not a garnish — it is the anchor that separates this park from everything nearby, and the reason the venue can trade later into the evening.


Family-friendly configuration is retention, not decoration.

The parent lounge and the party rooms decide whether a parent stands and waits or sits and spends. Place them badly and your weekend average ticket will tell you so.


Then let the 3D serve the plan.

Equipment layout and interior design come from one team, and the client reviews and confirms every detail before production starts. Rework on a screen is an order of magnitude cheaper than rework on site.


Step 6 — Negotiate the lease like an operator


Industrial property gives you what a mall cannot: clear height, floor area, cheaper rent, and a driveway a container can actually reach. It also hands you bills a mall never would.


1. Model the conversion cost separately. Floor loading and levelling, drainage, fire compartments, ventilation and HVAC, electrical capacity — in an old workshop these five frequently exceed a meaningful share of the equipment budget. Pay an engineer for a site assessment before you sign, not after you open.


2. The term has to amortise the conversion. Money spent on the building needs a lease long enough to spread it. Long term, long rent-free period, or landlord contribution — take at least one of the three.


3. Rent-free from handover, not from signature. Clearing, permitting and site preparation in an industrial building all consume calendar time.

4.Put the permit responsibility in the contract. Whether the landlord or the tenant files the change of use (cambio de uso) and the works permit decides whether you start on the date you planned.


5. Delivery and installation access. Karting barriers and a two-level tower are large objects. Confirm a container can park at the door, the slab can take the load, and there is room to lift — miss this and installation grows two weeks out of nowhere.


6. Exclusivity and radius protection. A clause stopping the landlord from leasing neighbouring space to a direct competitor. In an industrial zone this is worth pushing, because the empty unit next door is usually large.


7. Term, renewal and exit. You want an executable break or renegotiation point around year five — not a sentence saying "to be discussed".


Step 7 — Manufacturing, shipping, and why "installed" is not "open"


Before dispatch, the core functional areas were built at 1:1 in our 30,000 m² plant in Wenzhou: from the load-bearing structure of the high-rope frame to the curve joints of the karting circuit, every connection and every padding module was rehearsed and calibrated on the floor. Once it passed, components were numbered, disassembled and packed.


The 1:1 build solves two problems: the client sees the real thing before it crosses the ocean, and the crew receives a numbered puzzle instead of a pile of steel. On a 2,200 m² site with five zones, that is the difference between a five-week installation and a ten-week one.

For installation, our teams flew to Chile in batches after Chinese New Year and the site moved smoothly — because the site itself was good: a former vehicle workshop of a large local company, with a regular structure and fire infrastructure already in place. Worth writing down: an old workshop is not automatically easier — "regular structure plus working fire infrastructure" is what makes it easier. The same vintage of building with improvised bracing will double your conversion cost.


Then the part nobody puts in the brochure: installation completion is not opening.

After the last bolt is torqued, you still need the fire sign-off, the electrical certification, the municipal works sign-off (recepción) and business licence, a live civil liability policy, and a team that has actually rehearsed an evacuation.


Step 8 — Hire and train before opening day

The most common staffing mistake is hiring one manager and expecting them to handle safety supervision, front desk, community marketing and party sales at once. That person does not exist at the salary you are planning to pay.


Hiring order:

1. General Manager (gerente)— early, so they complete full operational training well before opening.


2. Party and Events Coordinator — the party rooms are product lines; birthday packages are an active sales function, not a scheduling task.


3. Floor Supervisors / Safety Coaches — the frontline staff who enforce rules, cover blind spots, and are the reason a parent can sit down with a coffee.


4. Reception and Cashier — with ticketing and digital waivers that do not create a Saturday morning queue.


Pre-opening training must cover: correct use and safety limits of every attraction, the daily safety-check routine, emergency response, customer-service standards, party execution, and the POS/membership system. The Gran Canaria handover was run against this checklist — every attraction taught in detail, daily checks turned into a fixed routine, service standards scripted — before the doors opened.


Step 9 — Design the first 90 days in

This park has only just opened. The opening plan was written with the client for the Concepción market specifically, and staff training is still running. But the most convincing number is not any of that — it is this: the third store is already in fit-out.


·First, brand is an asset that starts working on day one.

The client replaced his own name with Pokiddo — he was not buying a logo, he was buying an advance payment of "professional, reliable, fun" in the customer's mind. In a market already crowded with imitators, that head start is worth more than two extra machines.


·Second, put content refresh on the calendar instead of rescuing a fading venue later.

The opening campaign, seasonal themes, standardised party products — these are what keep month four as busy as month one. Equipment depreciates; content does not.


·Third, the membership system is a repeat-purchase engine, not a stored-value card.

Membership logic and marketing tools are what tell you who has not come back in three months. Without that list, every promotion you run is shouted at nobody.


·Fourth, treat "replicable" as a design goal.

Behind this project is a family: the client's children and nephews are spread across different Chilean cities, and each new store is handed to one of the younger generation to run. That makes the first store more than a business — it is the template. Training manuals, opening playbooks, supplier response times all have to survive duplication. That is the real reason three stores were signed.


Frequently Asked Questions (FAQ)

Q: Do I need industry experience to open a park in Spain?

A:No. Most of the operators we work with are first-time investors coming from restaurants, retail, real estate and hotels. The gap that matters is operational, and it is closed by training and by a partner who runs parks — not by a trader who only sells equipment.


Q: Should I open inside a mall or in a standalone site?

A:A mall buys you traffic that is already coming, plus parking and air-conditioning someone else maintains; you pay for it in common charges, landlord review, trading-hour constraints, and limits on dock access and night work. A standalone site gives you freedom but you buy your own traffic. For a project around 2,000 m² with an outdoor area, a mall is usually the steadier start; for a 700–1,500 m² indoor park, a community location can work very well.


Q: How much capital does a Spanish park need?

A:It depends on area, clear height, attraction mix, mall versus standalone, and local fit-out costs. Anyone quoting before seeing your floor plan is guessing. Send us the plan and we will return an itemised budget that separates equipment, freight, duty, installation, interior fit-out and outdoor works.


Q: How long from first call to opening?

A:For a 700–1,500 m² indoor venue, typically 3–5 months; for a project around 2,000 m² including outdoor space, plan 4.5–6 months. The Gran Canaria project took four and a half, with permitting and landlord review on the critical path — not manufacturing.


Q:Can I import equipment from China and still meet Spanish requirements?

A:Yes, provided the design is built to EN 1176 / EN 1177 and REACH from the start, with documentation traceable to the shipped batch. The failures we see are rarely about manufacturing quality — they are about a layout drawn to a different standard, and test reports that cannot be matched to the model on site.


Q: What is the biggest mistake first-time investors make?

A:Signing the lease before the design, the permit route and the opening date are confirmed. Rent and deposit start on signature day. Permits do not.


Next step

If you are evaluating a site in Spain — or in the Canaries specifically — send our engineering and operations team four things:

1. Architectural floor plan (CAD or PDF, with column grid, entrances, emergency exits and the usable outdoor boundary)

2. Clear height to the lowest beam or ductwork

3. Target player age range and planned investment budget

4. Project city and island


You will receive a custom 2D CAD layout proposal and an itemised preliminary quotation for your space — and, if it helps, the Spain Launch Checklist we use internally: the sequencing of the licencia de apertura and the proyecto técnico, the EN 1176 points that get inspected, and the mall lease clauses worth fighting for.


POKIDDO Makes Sports Fun. And in Spain, the parks that make money are the ones that had permits, circulation and the high season worked out on the first drawing.


Click the business card/scan the QR code-Get more information.




Pokiddo 1700sqm Real Case Pokiddocanarias Indoor Trampoline Park Indoor Family Entertainment Park

Concepción Chile Family Sports Center:2,200 ㎡, 5 Zones, 7–8 M Ceiling Turnkey Trampoline Slide Climbing High Ropes

PartyMars Beijing:8,000 M² 114 Attractions 8 Zones Inside Multi-Activity Indoor Play Destination

Bettaplay 2380 Sqm Sports & Entertainment Amusement Park Facilities Indoor Amusement Equipment Indoor Playground Commercial One-Stop Kids Indoor Playground Soft Play Center Customized Theme Park

Bettaplay 2000Sqm Custom Theme Indoor Playground Space Adult Toddler Children Home Castle Kids Playground Set Equipment

Bettaplay 2400Sqm Commercial One-Stop Kids Indoor Playground Soft Play Center Customized Theme Park Equipment

Bettaplay 2500Sqm Custom Theme Indoor Playground Space Children Home Castle Kids Playground Set Equipment

Bettaplay 2600Sqm OEM Custom Children's Play Equipment Maze Games Indoor Playground Equipment Large Trampoline Parks Soft Ball Pools

Bettaplay 3000 Sqm Custom Children's Indoor Playground Equipment Soft Play Playground Large & Small Indoor Children's Play Areas Free Design Services

Bettaplay 3275 Sqm Commercial Indoor Playground Trampoline with Slide for Custom Design and Creative Kids

Bettaplay 3600 Sqm Indoor Playground Trampoline with Slide for Custom Design and Creative Kids

Bettaplay 3995 Sqm Large Kids Indoor Playground Maze Ninja Indoor Kids Children Playground Equipment Good Big Slide Swing Manufacturers

Bettaplay 4500 Sqm Custom Commercial Indoor Playground Equipment-Kids Soft Play Maze Adventure Park Large Slide for Shopping Malls Metal

Bettaplay 5000 Sqm Children Play Zone Naughty Castle Indoor Playground Kids Playground Rides Indoor Naughty Castle

Bettaplay 6000 Sqm Eco-friendly Turnkey Solution Luxury Indoor Playground Equipment with Jungle Theme&Trampoline Park

Bettaplay 7000 Sqm Commercial Children Jumping Park Customized Trampoline Park High Elastic Amusement Park Indoor Playground

Bettaplay 8739 sqm Modern Custom Amusement Park Equipment Kids Indoor Playground With Ball Pit

Bettaplay 1900 sqm Turnkey Solution Commercial Kids Indoor Playground Equipment

Bettaplay 1800 sqm Indoor Playground Durable Playground Structure High-Quality Kids Amusement

Bettaplay 1714sqm Children's Playground Manufacturers Customize Soft Playground Equipment